Deprecated: Assigning the return value of new by reference is deprecated in /nfs/c02/h08/mnt/15556/domains/blog.aaronopsal.com/html/wp-includes/cache.php on line 36

Deprecated: Assigning the return value of new by reference is deprecated in /nfs/c02/h08/mnt/15556/domains/blog.aaronopsal.com/html/wp-includes/query.php on line 21

Deprecated: Assigning the return value of new by reference is deprecated in /nfs/c02/h08/mnt/15556/domains/blog.aaronopsal.com/html/wp-includes/theme.php on line 540
2008 March | Berlin+Opsal Residence :: Dallas, TX

Archive for March, 2008

LIGHT ‘EM UP

hallway_1.jpg

hallway_2.jpg

We just passed electrical inspection and the upstairs hallway is now fully lit.

A LITTLE ROOM TO MOVE AROUND

bedroom_1.jpg

The guest bedrooms upstairs are very close to completion. The main bedroom doors use a beautiful Boomer floor and ceiling door hinge that creates a seamless and hingless entry to the bedrooms. The floor to ceiling cabinetry define the closet system and add plenty of storage. The clear acrylic Artemis ceiling fans add a little fun and drama to the rooms.

UPS AND DOWNS

stairwell.jpg

The wood dividing wall in the stairwell is almost complete. A little more sanding and mild white stain will complete the finish. You can see just a hint of the massive ebony stained cabinet downstairs that will welcome guests.

IN IT FOR THE LONG HALL(WAY)

hallway_paint1.jpg

Once again the painters are hard at work. The hallway and upstairs cabinets are all finished and painted. It’s great to see everything without all the drop clothes and masking tape. Next comes lighting and electrical.

SET AND STAINED

livingroomavcabinet.jpg

The main living room AV cabinet received its finish coat of ebonized stain thanks to the guys at Lozoya Painting and the masterful wood work of the guys from R&R Remodeling. You can check out the before stain photos here. Drawer and cabinet hardware should be installed early next week.

ALL WASHED UP

master_bath.jpg

Master bathroom is almost complete. Just a few more adjustments for the WetStyle vanity and installation of the shower enclosure glass, mirrors and lighting. The guys from Doug’s Plumbing did a great job of installing and aligning all of the fixture. More photos to come next week.