The entryway vestibule glass work is now in along with the new flatwork around the pool area. The entryway to the house is accessed from a bridge system that leads guest over the top of the pool and then into the home. Landscaping in the main lawn area should begin next week.
Search
LATEST POSTS
RSSCATEGORY LIST
- ARCHITECTURAL RENDERINGS (5)
- CONSTRUCTION PHOTOS (40)
- DESIGN IDEAS/INSPIRATION (11)
- DESIGN PHILOSOPHY (3)
- MODERN BUZZ (3)
- PERSONAL (2)
CALENDAR
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| « Jun | ||||||
| 1 | 2 | 3 | 4 | 5 | ||
| 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 13 | 14 | 15 | 16 | 17 | 18 | 19 |
| 20 | 21 | 22 | 23 | 24 | 25 | 26 |
| 27 | 28 | 29 | 30 | 31 | ||

0 Responses to “OUTSIDE AND LOOKING IN”