The cement plaster on the main tower section started this week. It’s an amazing craft and almost therapeutic to watch these guys work. It’s a four step process for every wall. The end result looks like poured-in-place concrete and is glass smooth to the touch. The plaster wraps the entire front entry tower inside and out and also defines the back wall of the kitchen and the mantle in the living room.